Project Details

Customer:
Shawmut Design and Construction

Contract Value:
$2,300,000

Engineer:
Odeh

Tons:
630

Comments:
The Aquatic Center was a Design Build Project that entailed Architecturally exposed tube steel trusses over the pool area with a zinc-rich primer to protect the steel from corrosion.

Brown University Aquatic Center

  • brown-00
  • brown-01
  • brown-02
  • brown-03
  • brown-04