Project Details
Customer:
Shawmut Design and Construction
Contract Value:
$2,300,000
Engineer:
Odeh
Tons:
630
Comments:
The Aquatic Center was a Design Build Project that entailed Architecturally exposed tube steel trusses over the pool area with a zinc-rich primer to protect the steel from corrosion.





