Project Details

Customer:
Dimeo Construction

Contract Value:
$3,300,000

Engineer:
SMMA

Tons:
1,245

Comments:
This project consisted of many braced frames utilizing mostly HSS shapes and some rod/turnbuckle assemblies. The perimeter consisted of continuous relieving angles and hung lintels that had to be set to tight tolerances. Shepard Steel ensured that there was sufficient field adjustment to meet the tolerances and verified the placement once completed. Four catwalks were fabricated and erected with the structural steel in the auditorium, including one spanning approximately 80 feet. The miscellaneous metals package was also completed by Shepard Steel.

Grafton High School

  • grafton-01
  • grafton-02
  • grafton-03
  • grafton-04
This project consisted of many braced frames utilizing mostly HSS shapes and some rod/turnbuckle assemblies. The perimeter consisted of continuous relieving angles and hung lintels that had to be set to tight tolerances. Shepard Steel ensured that there was sufficient field adjustment to meet the tolerances and verified the placement once completed. Four catwalks were fabricated and erected with the structural steel in the auditorium, including one spanning approximately 80 feet. The miscellaneous metals package was also completed by Shepard Steel.